Concrete pressure is shifted to the climbing bracket by means of vertical waling and prop mounted behind wall formwork and then climbing bracket transfers this load to the stop anchor placed into concrete previously. The system can be carried massively thanks to the case that components are connected each other.

The system can be carried massively thanks to the case that components are connected each other.

Projects using this system