Located between Uskudar and Cekmekoy stations, Uskudar-Umraniye-Cekmekoy metro line is a rail transit system on which there are about 17 km lenght of main line tunels, totally 16 stations in the types of bored and cut-and-cover tunnels, about 2,7 km of depot area connection tunnel, depot area, maintenance area and buildings.

The concrete castings of single-sided walls in the height of up to 8,5 m, large columns in the dimensions of 140X140 and slabs in the thickness of 1 m were realized successfully with Intek Formwork and Scaffolding systems designed and manufactured in comformity with European norms. The formworks and scaffoldings supplied for Necip Fazil and Baglarbasi metro stations, which were constructed initially, were utilized on other stations in compliance with working schedule.

Systems Used in This Project