A considerable part of Zorlu Center project, whose main contractor was Akturk Yapi Industry, was achieved by Delta Construction.

I block (performance art center, conference hall, parking areas): 210.000 m²
G block (ball room and shopping center): 110.000 m²
Beltways and access roads, parking area entrances, technic house: 95.000 m²
Delta Construction and İNTEK Formwork cooperated in a whole solution partner collaboration and performed a very successful task together during 18 months of construction period of 415.000 m² area.

INTEK Formwork systems, used in the project where both puchase and rental methods were partially preferred, and quantities are as follows:

  • Inteva wall formwork: 600 m²
  • Inteva column formwork: 396 m²
  • Panemax wall formwork: 410 m²
  • HD 150 slab formwork: 10.000 m²
  • Ø60 circular column formwork: H=550 cm 1 set
  • Ø70 circular column formwork: H=550 cm 2 sets
  • Ø80 circular column formwork: H=550 cm 6 sets
  • Ø180 circular column formwork: H=550 cm 4 sets
Systems Used in This Project