Those who prefer Intek Projects
Due to being a penal institution, there is a large quantity of reinforced concrete shearwall on the project which has totally 36.000 m2 of construction area. On A,B and C blocks, the reinforced concrete shearwalls, having 50.000 m2 length in metres, were formed with just 530 m2 of Panemax wall formwork. Boundary walls were also poured with the same formworks and so, Panemax wall formworks were used for more than 100 times in that project and then they were sent to another penal institution project after the construction was completed. As it is seen from this example, Panemax system is very durable and long-lasting.