Those who prefer Intek Projects
The wall-column formworks of following structures of Olympic Complex project in accordance with 1st phase were solved by Intek Formwork systems. Those are as follows;
INTEK Formwork systems, used in these structures, and quantities are as follows:
When it was specified the formwork needs of these structures which started at different times, both site management and Intek’s project engineers and supervisors performed a very successful team work together and provided optimum solutions by utilizing available formwork stock up to the little part at every stages.