The wall-column formworks of following structures of Olympic Complex project in accordance with 1st phase were solved by Intek Formwork systems. Those are as follows;

  • 800-bed hotel and press centre
  • 450-bed VIP hotel
  • 6.000-person indoor cycling track
  • 15.000-person indoor arena for team sports
  • 5.000-person indoor arena for individual sports
  • Training halls

INTEK Formwork systems, used in these structures, and quantities are as follows:

  • Inteva and ADP systems: 10.168 m2 (h=715 – 880 cm)
  • Panemax system: 1.420 m2 (h=715 – 880 cm)

When it was specified the formwork needs of these structures which started at different times, both site management and Intek’s project engineers and supervisors performed a very successful team work together and provided optimum solutions by utilizing available formwork stock up to the little part at every stages.