Throughout the project, there existed 75.000 m2 of slabs, angled rising beam in the dimension of 60X130 where 92 items of precast stairs settled, 164 items of vertical rising D80 column, 164 items of angled rising D80 column, 54 items of concentric vertical and angled rising double D80 column, 155 items of vertical rising D55 column. In addition to those, there were also various shaft walls, columns and walls. One of the most significant properties of the project was either 8 items of angled rising cores. The roof of the stadium settled onto those 8 cores.

FC Shakhtar Stadium project necessiated a quite tough application with its structure located on an inclined land, which rose by widening out of center towards outward and ended on different levels. As it was thought that the most critical part, the cores, should proceed without waiting for digged slabs and the roofs should begin to be mounted immediately, totally 4 sets of core wall formwork and climbing equipment were stocked. It was supplied TDD climbing equipment and specially designed 150A adjustable climbing brackets for cores as well as Inteva large area wall formwork and 150A standard climbing brackets. While the cores rose angularly after climbing two floors straight on some sections, they rose angularly from the beginning on another sections. There were constant changes on the dimensions of outward angled rising walls. But, the wall thickness on top floor arose from 50 cm to 70 cm. The flexibility of Inteva wall formwork enabled to be provided appropriate solutions for the changeable structure of the cores. Except from the core formworks, it was also supplied 21 items of flat and angled rising circular column formwork, 19 sets of square and rectangle column formwork and approximately 1360 m2 of shaft wall formwork. Besides; it was preferred Inteva system for supplied wall-column formworks as well as the one in core formworks. Moreover; 5 sets of 60X130 beam soffit and beam side were provided. It was chosen HD 150 system as beam soffit formwork. The basic frames in different heights on HD 150 system enabled providing solutions for all heights under angled rising beam.

Systems Used in This Project