Those who prefer Intek Projects
Consisting of the blocks of central hospital, rehabilitation hospital, cardiovascular, general hospital, maternity and children hospital, psychiatry, high security psychiatry, parking, technical central building, the residing area of this huge project is 193.000 m2 and construcion area is 464.000 m2 in total.
It was used both Inteva wooden beam system and Panemax panel formwork system on walls-columns. In addition to that, it was used HD 150 tower system on slabs and utilized as tableform on appropriate sections of the building.