The walls-colums were formed with Inteva large area panel system and the slabs with HD 150 tower system. It was provided 150 A climbing brackets for outer sides of the walls. On inner walls and inner sides of outer walls, the essential platforms to settle wall formworks on the second phase were constructed with the components of HD 150 tower system which would be utilized on slab formwork in the direction of site’s preference.